Do you need this or any other assignment done for you from scratch?
We assure you a quality paper that is 100% free from plagiarism and AI.
You can choose either format of your choice ( Apa, Mla, Havard, Chicago, or any other)
NB: We do not resell your papers. Upon ordering, we do an original paper exclusively for you.
NB: All your data is kept safe from the public.
Module 04 Content
Question In this Module, you are responsible for creating a Status Update and a Software Installation Plan.
The following item(s) are required in this Module:
Status Update
Utilize this Status Update template to provide the following:
Module04 Status Update Template
Work Completed Last Week
Work Planned for Next Week
Open Issues
Open Risks
Deliverables and Milestones
Key Performance Indicators (KPI’s) and Remediation Plan
Software Installation Plan
Utilize this Software Installation Plan template to detail the requirements for installing various pieces of software:
Module04 Software Installation Plan Template
Required Items
Pre-installation Configurations
Installation Steps
Post-Installation Configurations
Post-Installation Maintenance
Note: The templates have comments in blue italics that will provide guidance as to what is typically included in each section. Please delete these comments before submitting your completed template.
Sample Document
Use the following sample document as a reference for your Status Update Plan document. Note that the sample may be different from the template provided and is only a reference. Your own submission must make use of the project template provided and be written in your own words.
Do you need this or any other assignment done for you from scratch?
We assure you a quality paper that is 100% free from plagiarism and AI.
You can choose either format of your choice ( Apa, Mla, Havard, Chicago, or any other)
NB: We do not resell your papers. Upon ordering, we do an original paper exclusively for you.
NB: All your data is kept safe from the public.