Power Plant Internationals Risk Assessment Plan

Do you need this or any other assignment done for you from scratch?
We assure you a quality paper that is 100% free from plagiarism and AI.
You can choose either format of your choice ( Apa, Mla, Havard, Chicago, or any other)

NB: We do not resell your papers. Upon ordering, we do an original paper exclusively for you.

NB: All your data is kept safe from the public.

Click Here To Order Now!

Power Plant Internationals Risk Assessment Plan

Risk assessment is how an organization may identify the processes and occurrences that may delay or harm organizations set objectives and timelines. The organization is also tasked to foresee how every situation will occur and predict how bad it may happen (Aven, 2016). Lastly, the organization must determine how every case will be prevented and, if possible, how it will be fully controlled.

The following is a risk assessment plan for Power Plant International to import a GT 6 Bladed Rotor.

Project Number: 1
Project Acronym: GT
Project Title: Importation of GT 6 Bladed Rotor
Start date of the Project: 10thApril 2022
Duration: Seven months
Risk Assessment
Task Hazard Risk Priority Control
Importation
Of a GT 6
Bladed
Rotor
At the port, delays in loading cargo may arise Delay in delivery time Medium Timely Planning
The Vessel is being shipped.
In the hurricane season and stormy weather is anticipated on the day of loading.
Sea blast due to inclement weather High Timely Planning to determine the weather
Offloading from the Vessel at Point Lisas port

Possibility of damage at Houston port

Damage High Ensure maximum care is exercised
Damage Maximum carefulness to be exercised
The agent or supplier not following proper lifting protocol Injury to back from lifting. High Proper selection of the agent
Industrial unrest at the Port of Guaira Injury of workers causing a delay in loading Low Talk to workers and confirm everything is in order
Poor choice of shipper Damaged ship and incompetent crew High Clear selection of the shipper
Berthing delay due to rough seas Berthing Delay Medium Maximum research to prevent the issue

Power Plant international is to successfully import a GT 6 Bladed Rotor scheduled from 22nd April and be delivered and installed by 1st November. Despite the foreseeable challenges, Power Plant is to make sure that each risk is carefully analyzed and a possible solution is developed to ensure successful product delivery (Coffey et al., 2019). Since it is making a loss of 1 million dollars in a day, Power Plant international has to put each effort and necessary preparations to make a successful import.

First, Power Plant International took the initiative to identify all the foreseeable risks that might arise during the importation of the product (Dehdashti et al., 2020). One of the most notable challenges identified was delays that would occur at the Houston port while loading. The next challenge identified was storms that would arise during the shipment was done during the hurricane season. Offloading would also be one of the problems encountered at Point Lisas Port. The agent or supplier assigned the task may neglect a few rules, which might cause possible damage (Bocanegra and Francés, 2021). Due to inclement weather, a sea blast was anticipated, and in the port of Guaira, there was expected unrest from the industrial workers. Loading would be delayed due to workers injury and uncharacterized incoterms for the shipment (Fox et al., 2018). Rough seas would cause berthing delays, while the poor choice of shipper would cause ship damage and selection of incompetent crew.

After successfully identifying the foreseeable challenges, a risk register was necessary to keep track of them Lloyd-Jones, et al. (2019). The specific areas where challenges were anticipated to occur were marked, and tracking started. The next risk would be identifying the most adverse challenges that would cause big harm in case they would occur. The process was important in providing reference to those risks that would be given priority for monitoring. The risks are to be identified into three categories: high, low, and Moderate (Lundberg and Willis, 2016). Risk triggers were as well-identified and noted, which aided in controlling some of the potentially high risks.

Developing risk solutions is an integral part of the risk assessment plan despite the necessary precautions and strategies put in place, problems may still happen which might cause a lot of inconveniences (Orlando et al., 2016). Therefore, necessary solutions should be developed, and the best way to do that would be by brainstorming. Clear, precise, and concisely created solutions are essential to avert any risk should any challenge proceeds to occur. One solution was to ensure the Cargo is collected by 10th October and delivered to the Houston of the port by the 14th. The loading of the product on the ship would then happen on the 16th of the same month by afternoon. The product will arrive in the Venezuela port by 25th October and be delivered to Point Lisas on the 28th (Shahid and Thomas, 2018). The plan was to ensure early delivery to recover time that might have been lost during the unprecedented delays that might have occurred during the shipment.

An action plan was developed to assist in many cases a big problem would occur. It normally requires laying down a communication plan of the relevant authorities that need to be informed first in case of an occurrence. Assembling of a response team should be carefully done and specific guidelines on how to respond to different issues if they arise (US Preventive Services Task Force et al., 2019). Finally, monitoring the risk and delegating duties to the responsible team members is important so they can raise any issues as soon as they notice or come across any.

Reference List

Aven, T. (2016) Risk assessment and risk management: Review of recent advances on their foundation, European Journal of operational research, 253(1), pp. 113.

Bocanegra, R. A., and Francés, F. (2021) Assessing the risk of vehicle instability due to flooding, Journal of flood risk management.

Coffey, M. et al. (2019) Recovery-focused mental health care planning and coordination in acute inpatient mental health settings: a cross-national comparative mixed-methods study, BMC Psychiatry, 19(1), p. 115.

Dehdashti, A. et al. (2020) Applying health, safety, and environmental risk assessment at academic settings, BMC public health, 20(1), p. 1328.

Fox, M. A. et al. (2018) Implications of applying cumulative risk assessment to the workplace, Environment international, 115, pp. 230238.

Lloyd-Jones, D. M. et al. (2019) Use of risk assessment tools to guide decision-making in the primary prevention of atherosclerotic cardiovascular disease: A special report from the American heart association and American college of cardiology, Circulation, 139(25), pp. e1162e1177.

Lundberg, R. and Willis, H. H. (2016) Deliberative risk ranking to inform homeland security strategic planning, Journal of homeland security and emergency management, 13(1).

Orlando, L. A. et al. (2016) Clinical utility of a Web-enabled risk-assessment and clinical decision support program, Genetics in medicine: official Journal of the American College of Medical Genetics, 18(10), pp. 10201028.

Shahid, S. and Thomas, S. (2018) Situation, background, assessment, recommendation (SBAR) communication tool for handoff in health care  A narrative review, Safety in health, 4(1).

US Preventive Services Task Force et al. (2019) Risk assessment, genetic counseling, and genetic testing for BRCA-related cancer: US Preventive Services Task Force recommendation statement: US preventive services task force recommendation statement, JAMA: The Journal of the American Medical Association, 322(7), pp. 652665

Do you need this or any other assignment done for you from scratch?
We assure you a quality paper that is 100% free from plagiarism and AI.
You can choose either format of your choice ( Apa, Mla, Havard, Chicago, or any other)

NB: We do not resell your papers. Upon ordering, we do an original paper exclusively for you.

NB: All your data is kept safe from the public.

Click Here To Order Now!